Date of Manufacture, SLED/BBD

$
0
0

Hi friends,

we assign Date of Manufacture as manufacturing date and SLED/BBD as Expire date for our products. We manufacture our FG using 2 level or 3 level SFG. Our requirement is date of release of process order for the 1st SFG should be the manufacturing date and same date should be considered as manufacturing date for next level SFG and finally for FG.

for example in the case below, mfg date for SFG 1 should be the date of release of process order, and same date is required for SFG2, SFG3 and FG instead of date of release of order.

 

OrderMaterial NumberBatchMfg DateExp DateOrder TypeCreated on
1000000124160000017100011318.10.201510.2018YP01SFG 118/10/2015
2000000062160000018100011321.10.201510.2018YP02SFG 221/10/2015
2500000024160000019100011318.10.201510.2018YP03SFG 318/10/2015
3000000114170000008100011314.11.201511.2018YP04FG14/11/2015

 

If suggest the configuration procedure.