Re: standard cost estimate

$
0
0

hi,

 

what system showing is correct, as in your BOM only one material is there, system is taking same cost as cost of header material.

 

if instead, there were 3 raw materials in BOM, system would have added cost of 3 materials.

 

With regards,

Prathamesh Lonkar