Quantcast
Channel: SCN: Message List - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 2633

Assembly Scrap Controlling in CO15.

$
0
0

Hi,

 

I have a production order for a MATERIAL X whose Total Qty is 110 pcs includes 10 % i.e., 10 pcs as Planned Scrap.

 

Requirement :

 

We use Order Confirmation via CO15. Here my planned yield for this Production Order is 100 pcs, if i enter Final Confirmation with less than 100 pcs the system should ask for Reason for Rejection.

 

i.e., Till the Planned Scrap i don't need reason, but if exceed that the reason should be tracked.

 

Thanks With Regards,

Dinesh Kumar V.


Viewing all articles
Browse latest Browse all 2633

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>