Hi,
I have a production order for a MATERIAL X whose Total Qty is 110 pcs includes 10 % i.e., 10 pcs as Planned Scrap.
Requirement :
We use Order Confirmation via CO15. Here my planned yield for this Production Order is 100 pcs, if i enter Final Confirmation with less than 100 pcs the system should ask for Reason for Rejection.
i.e., Till the Planned Scrap i don't need reason, but if exceed that the reason should be tracked.
Thanks With Regards,
Dinesh Kumar V.